Try our cookies Alza.cz a. s., Company identification number 27082440, use cookies and other data to ensure the proper functioning of the website and, with your consent, also, among other things, to personalize advertising and the content of our websites. By clicking on the “I understand“ button, you agree to the use of cookies and the transfer of data regarding the behavior on the website for displaying targeted advertising on social networks and advertising networks on other websites.
Alzak icon

We'll bring it in.
We'll plug it in.
Choose the time.

Tomorrow, weekend or no weekend! *

* Applies in approximately 91 % of cases, except for unexpected situations that may occur when ordering and paying for the order before 16.00 (payment is not required if you choose the Cash on Delivery option).

Alza doručení velkých elektrospotřebičů

Leave it all to us

We deliver all over
Czechia *

Choose your date and time – we deliver all week, Mon–Sun, from 8:00-20:00

We will bring the appliance to your home and plug it in*

Install the appliance or TV on the wall **

Clean up the packaging material and take your old appliance away

12% VAT rate available

* Please note that delivery and carrying-in are carried out by a two-person crew, who need sufficient space to move around.
If sufficient space is not available, this service cannot be provided, due to the risk of damaging the appliances being carried in, damaging your property or causing injury to the crew.
In such cases, we will refund the difference between the Basic and Complete delivery charges. If you subsequently arrange for the appliance to be carried in yourself, we will not reimburse any costs incurred in doing so. 


** All additional services, except for the installation of built-in ovens and cooktops, are provided by AlzaExpres.
We cannot guarantee the full range of services when AlzaExpres is operating at full capacity or when delivery is handled by another external carrier.

Choose from two types of delivery

 

Delivery Behind the First Lockable Door

starting from CZK 399

The driver will deliver the appliance behind the first lockable door (e.g. the front door of an apartment building, the gate of a family house, etc.)

Recommended

Complete Delivery
To Your Apartment

starting from CZK 699

The delivery crew will bring the appliance to your apartment and place it exactly where you need it. Can only be used for products up to 150 kg.

Choice of delivery time

Supplementary services

If you have your appliance delivered using AlzaExpres, you can also take advantage of a range of services, such as Built-in Appliance Installation or TV Wall Mounting. The service is available only for items in stock at Alza.cz.

Installation of freestanding electrical appliances

Removal of your old appliance

Delivery insurance

Need to have built-in appliances installed?

Find out how our built-in appliance installation service works and what you need to prepare before our crew arrives.

Montáž TV

TV installation

Montáž vestavné lednice

Built-in fridge installation

Montáž vestavného mrazáku

Built-in freezer installation

Montáž vestavné myčky

Built-in dishwasher installation

Montáž elektrické varné desky

Electric cooktop installation

Montáž vestavné trouby / mikrovlnky

Built-in electric oven installation

Montáž vestavné vinotéky

Built-in wine cooler installation

Montáž vestavné pračky

Built-in washing machine installation

Montáž vestavné sušičky

Built-in tumble dryer installation

Montáž vestavné mikrovlnné trouby

Built-in microwave installation

Montáž vestavného kávovaru

Built-in coffee machine installation

Montáž vestavné ohřívací zásuvky

Built-in warming drawer installation

The service is available only for items in stock at Alza.cz.

Save when you buy a built-in appliance with installation

Reduced VAT rate from 21% to 12%

To qualify for the lower VAT rate, you must meet the conditions set out by law. Learn more.

What should I do before you arrive?

Check the dimensions

Before placing your order, check the dimensions of the items, as well as the width of your doors, corridors and other access points, to make sure the crew can safely carry the delivery in.

Wait for the text message

On the day of delivery, AlzaExpres will send you a text message with information about when your items will be delivered.

The crew will contact you

Once the AlzaExpres crew is on its way, they will contact you by phone.

Clear the way

Remove anything that could obstruct the crew's path.

Protect your floor

If you have wooden flooring, we recommend covering it with cardboard or something similar to prevent damage.

Check the packaging

Check the packaging when accepting the delivery. If it is significantly damaged, contact us on: 225 340 111.

What is included in the basic installation of freestanding electrical appliances?

Montáž lednice
Montáž Pračky
Montáž sušičky
Montáž myčky
Montáž trouby a varné desky
Montáž televize

FAQ

I live on the 12th floor. Are you really going to deliver my appliance to my apartment?

Yes. Our two-man crew will carry the appliance all the way to your apartment and place it where you need it (applies to delivery to a single apartment or commercial space).

Is it possible you won’t be able to deliver the goods behind the first lockable door?

As part of this service, we will do everything we can to ensure that your goods are delivered. However, there may be exceptional cases in which this is not possible. For example, steep or narrow stairs leading to the first lockable door, unpaved (muddy) road, slippery terrain, etc.

Does the service apply to products from external warehouses?

Unfortunately, not yet. For products shipped from external warehouses of our partners, we are unable to offer the shipping options and follow-up services listed here.

Is delivery with AlzaExpres Complet safe?

Yes, safety is paramount for us. We follow the current sanitary measures as mandated by the government, the Ministry of Health, the regional sanitary stations and the common sense.

What should I do if I am not satisfied with the service?

We strive to provide the best service possible, but we understand that there may still be grounds for submitting a claim. Did you discover the parcel was damaged after you had collected it and the carrier had already left? Are you unhappy with the installation of the appliance or the behaviour of our crew? In this case, please contact us via the contact form or our call centre.

You can contact our call centre via our 24/7 customer helpline on 225 340 111. Alternatively, you can also reach us via WhatsApp or Messenger.

Please make sure to include:

  • your order number
  • your parcel number
  • description of the defect (we recommend adding a photo)
  • your contact details

Did you order the Installation of a Built-in Appliance service along with your appliance?

After completing your order, our call centre staff will contact you to specify the date and installation details to ensure that everything runs smoothly. The shipping fee is not included in the service.

What are the conditions for applying for a reduced VAT rate when buying a built-in appliance with the installation service?

The reduced VAT rate applies if the conditions set out in § 48 and § 49 of Act No. 235/2004 Coll., on Value Added Tax (hereinafter the “VAT Act”), are met and the customer purchases installation together with the built-in appliance. This applies in particular, but not exclusively, to private individuals who are not carrying on a business (non-taxable persons who have not provided a Company ID No. or VAT ID), provided that the following conditions are met:

  • The appliance is built into a completed building for housing or a building for social housing in accordance with § 48 and § 49 of the VAT Act. The decisive factor is the information on the use of the building registered in the Land Registry.
  • The customer shall specify in the order the delivery address for the installation of the built-in appliance, where the housing or social housing building is located according to the regulations governing the land register.

If the customer is an entrepreneur or a facility providing residential social services referred to in Section 48(5)(d) to (k) of the VAT Act and at the same time meets the conditions of Section 48 and Section 49 of the VAT Act for the application of the reduced VAT rate, he/she contacts Alza customer service and the possibility of applying the reduced rate is assessed individually.

Can I purchase the service and benefit from the reduced VAT rate even if I am an entrepreneur?

You can of course purchase the service, but unfortunately, you cannot apply for the reduced VAT rate. See § Section 48 of Act No. 235/2004 Coll. for more info.

How do I receive proof of payment?

Proof of payment will be issued upon request sent via the contact form. Please include your order number in your request. Payment of the order is also indicated by a "settled" flag in your order summary.

Installing freestanding electrical appliances

What does the service include?

  • The crew will unpack your appliance and take the packaging materials away with them. All you need to do is have the necessary water, power and waste connections ready.
  • This service is available only for freestanding electrical appliances (washing machines, tumble dryers, dishwashers, refrigerators, freezers, TVs, etc.). It does not apply to electric or gas cookers or other gas appliances.
  • For a built-in appliance, the crew will “only” unpack it and take the packaging materials away with them. If you would like us to install a built-in appliance, you need to order the additional Built-in Appliance Installation service together with the appliance.

Before the driver arrives and installation begins, please make sure that:

  • You have the necessary power (electricity and water) and waste water connections ready.
  • The connections are compatible with the appliance you have purchased.
  • The appliance you have purchased will fit in the designated space.
  • A dryer can only be stacked on top of a washing machine using the original stacking kit, provided no drilling is required. Otherwise, the appliances cannot be stacked.

Removal of your old appliance

What does the service include?

  • If you wish, our crew will take your old appliance away when delivering your new one (available with all delivery options), on a 1-for-1 basis (e.g. a new fridge in exchange for your old fridge or another old appliance of a similar or smaller size).

Before the driver arrives and the collection takes place, please make sure that:

  • Your old appliance is properly disconnected, clean and complete.
  • For washing machines, dishwashers, tumble dryers, refrigerators and freezers, it must also be dry and free of any ice build-up.
  • There must be no water left inside the appliance.

Delivery insurance

What does the service include?

  • If your order arrives damaged, we will process your claim as a priority. One of our customer service agents will contact you within 24 hours at the latest, and you can resolve everything together.
  • The CZK 39 fee is not included in the AlzaExpres service.
Montáž vestavné elektrické trouby

Built-in electric oven installation

We want buying a new built-in oven to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. If AlzaExpres is operating at full capacity, the installation will be carried out by an external delivery partner, who will contact you.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

TIP: Make sure that the dimensions of your built-in oven are compatible with your kitchen units. This is particularly important if you have an older kitchen, as you may need oven dimensions that differ from today’s standard sizes. The standard depth and height dimensions have changed by around 5 cm over the years.

What do you need to do to perpare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • Make sure there is a socket that is easily accessible and within reach of the appliance’s power cable, approximately 1 metre away. The electrical installation must therefore be suitably prepared for the appliance to be connected directly to the socket.
  • If you are replacing a hob-and-oven set, make sure that your hob is not controlled via the oven and can be operated independently.
  • If you are replacing a gas cooker, make sure that you have suitable electrical wiring ready for connecting the oven and that your property is equipped accordingly.

How does the installation work?

  • We will remove your existing electric oven and have it professionally disconnected (the gas connection must be performed by the customer).
  • Unpack and inspect your new oven to make sure everything is in order.
  • Professionally connect it to the prepared socket. If the power cable does not have a plug, we will fit one to the cable.
  • Install the appliance into the kitchen cabinet housing.
  • Switch on the new appliance to check that it is working properly.
  • Clean up afterwards and take away your old appliance and the packaging materials.
Montáž vestavné pračky

Built-in washing machine installation

We want buying a new built-in washing machine to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to perpare before the installation?

  • The necessary connections must be ready (electricity, water and waste).
  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • For successful installation, you must have a water supply with a functioning non-return valve and a fitting for a ¾" hose, as well as a functioning waste outlet or trap that allows the waste hose to be connected and sealed, no more than 1.5 metres from where the appliance is installed. If this requirement is not met and the appliance manufacturer permits the use of extended hoses, you must arrange a longer inlet or waste hose, or a suitable extension, before installation, in accordance with the manufacturer's instructions.
  • The electrical socket should be no more than 1.3 metres from the appliance.

How does the installation work?

  • We will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • Unpack and inspect your new washing machine to make sure everything is in order.
  • Connect the new appliance to the mains and connect the inlet and waste hoses.
  • Fit the furniture door to the new washing machine.
  • Run a basic programme to check that the washing machine is working properly.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.
Montáž vestavné sušičky

Built-in tumble dryer installation

We want buying a new built-in tumble dryer to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to perpare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • If your type of tumble dryer requires a water outlet, check whether a condensate drain kit is included with the appliance (the kit usually contains a waste hose, connectors and clips). If not, you will need to purchase one separately.
  • To connect the waste hose, you must have a separate functioning waste outlet. If you intend to connect it to the washing machine's waste outlet, you will need to have a double washing-machine waste connector ready.
  • The waste connection should be no more than 1.5 metres from the appliance.
  • The electrical socket should be no more than 1.3 metres from the appliance.

How does the installation work?

  • We will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • Unpack and inspect your new tumble dryer to make sure everything is in order.
  • Connect the new appliance to the mains and, where applicable, connect the waste hose (depending on the type of tumble dryer).
  • Fit the furniture door to the new tumble dryer, adjusting the hinge position if necessary.
  • Run a basic programme to check that the tumble dryer is working properly.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.
Montáž vestavné myčky

Built-in dishwasher installation

We do everything we can to make buying a new built-in dishwasher to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to perpare before the installation?

  • The necessary connections must be ready (electricity, water and waste).
  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • For successful installation, you must have a water supply with a functioning non-return valve and a fitting for a ¾" hose, as well as a functioning waste outlet or trap that allows the waste hose to be connected and sealed, no more than 1.5 metres from where the appliance is installed. If this requirement is not met and the appliance manufacturer permits the use of extended hoses, you must arrange a longer inlet or waste hose, or a suitable extension, before installation, in accordance with the manufacturer's instructions.
  • The electrical socket should be no more than 1.3 metres from the appliance.
  • A front panel suitable for your kitchen units.

How does the installation work?

  • We will remove your old dishwasher and furniture door, giving you the opportunity to clean any hard-to-reach areas.
  • Unpack and inspect your new dishwasher to make sure everything is in order.
  • Connect the new appliance to the mains and connect the inlet and waste hoses.
  • Fit the furniture front panel and restore the removed plinth to its original position.
  • Run a basic programme to check that the dishwasher is working properly.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.
Montáž vestavné lednice

Built-in refrigerator installation

We want buying a new built-in fridge to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to perpare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • The electrical socket should be no more than 1.5 metres from the appliance.
  • Make sure you have suitable furniture doors and hinges for installing the built-in fridge.

There are two types of hinge systems

When choosing a fridge or freezer, you need to pay attention to the type of door hinge system. There are two types of hinge systems.

Schéma spřažených pantů

Sliding hinges

With this system, the furniture door is attached to the cabinet using fixed hinges, while it is attached to the appliance door using sliding rails.

Schéma pevných pantů

Fixed hinges

With this system, the furniture door is attached directly to the appliance door and is not connected to the kitchen cabinet.

We only install the same type of hinge system

  • If your existing fridge or freezer has fixed hinges, we can only install an appliance with fixed hinges.
  • If your existing fridge or freezer has sliding hinges, we can only install an appliance with sliding hinges.

We do not install a different type of hinge system

  • If your existing fridge or freezer has sliding hinges, it is not possible to install the new appliance with fixed hinges.
  • If your existing fridge or freezer has fixed hinges, it is not possible to install the new appliance with sliding hinges.

How does the installation work?

  • We will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • Unpack and inspect your new appliance to make sure everything is in order.
  • At your request, we can change the direction in which the fridge door opens.
  • We will place the new fridge in the prepared cabinet, secure it and attach the furniture door.
  • Prepare the power cable for connecting the fridge to the mains.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.
  • You must switch on the built-in fridge yourself approximately 4–6 hours after installation to allow the refrigerant to settle.
Montáž vestavného mrazáku

Built-in freezer installation

We want buying a new built-in freezer to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to prepare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • The electrical socket should be no more than 1.3 metres from the appliance.
  • Make sure you have suitable furniture doors and hinges for installing the built-in freezer.

There are two types of hinge systems

When choosing a fridge or freezer, you need to pay attention to the type of door hinge system. There are two types of hinge systems.

Schéma spřažených pantů

Sliding hinges

With this system, the furniture door is attached to the cabinet using fixed hinges, while it is attached to the appliance door using sliding rails.

Schéma pevných pantů

Fixed hinges

With this system, the furniture door is attached directly to the appliance door and is not connected to the kitchen cabinet.

We only install the same type of hinge system

  • If your existing fridge or freezer has fixed hinges, we can only install an appliance with fixed hinges.
  • If your existing fridge or freezer has sliding hinges, we can only install an appliance with sliding hinges.

We do not install a different type of hinge system

  • If your existing fridge or freezer has sliding hinges, it is not possible to install the new appliance with fixed hinges.
  • If your existing fridge or freezer has fixed hinges, it is not possible to install the new appliance with sliding hinges.

How does the installation work?

  • We will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • Unpack and inspect your new appliance to make sure everything is in order.
  • At your request, we can change the direction in which the freezer door opens.
  • We will place the new freezer in the prepared cabinet, secure it and attach the furniture door.
  • Prepare the power cable for connecting the freezer to the mains.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.
  • You must switch on the built-in freezer yourself approximately 4–6 hours after installation to allow the refrigerant to settle.
Montáž vestavné vinotéky

Built-in wine cooler installation

We want buying a new built-in wine cooler to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to prepare before the installation?

  • A clear access route that allows the appliance to be carried to the intended location (sufficiently wide doorways, etc.).
  • The electrical socket should be no more than 1.3 metres from the appliance.

How does the installation work?

  • We will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • Unpack and inspect your new appliance to make sure everything is in order.
  • At your request, we can change the direction in which the wine cooler door opens.
  • We will place the new wine cooler in the prepared cabinet, secure it and attach the furniture door.
  • Prepare the power cable for connecting the wine cooler to the mains.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.
  • You must switch on the built-in wine cooler yourself approximately 4–6 hours after installation to allow the refrigerant to settle.
Montáž elektrické varné desky

Electric cooktop installation

We want buying a new electric hob to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. If AlzaExpres is operating at full capacity, the installation will be carried out by an external delivery partner, who will contact you.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to prepare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • A cut-out in the kitchen worktop matching the cooktop dimensions (standard: 560 + 2 mm × 490 + 2 mm).
  • Access to the electrical circuit breakers in your flat/house.
  • An installation box or separate covered terminal block that is easily accessible and within reach of the new appliance. The electrical installation must therefore be suitably prepared for the appliance to be connected directly. All connections must remain accessible for inspection, testing and maintenance.

How does the installation work?

  • We will remove your existing cooktop and have it professionally disconnected. If you are replacing a gas cooktop with an electric one, the existing cooktop must be disconnected by a certified gas engineer before the crew arrives.
  • Unpack the new appliance.
  • Professionally connect it to the installation box/terminal block in accordance with the applicable standards.
  • Fit the cooktop into the prepared cut-out in the kitchen worktop.
  • Switch on the hob and test that the cooking zones are working properly.
  • We will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will take away your old cooktop together with the packaging materials.
  • The service does not include cutting or enlarging the cooktop cut-out in the worktop. We do not modify or repair electrical installations, carry out any built-in alterations, or drill/cut into walls.

TIP: Make sure you have chosen a suitable cooktop. For an induction cooktop to work properly, sufficient space must be provided underneath it to ensure adequate air circulation and cooling. Otherwise, the cooktop may overheat and shut down. If there is not enough space underneath your worktop, it may be better to choose a ceramic cooktop, which does not require this space.

Montáž TV na zeď

TV wall mounting

We do everything we can to make buying a new TV as convenient as possible for you. That’s why we aim to deliver and wall-mount your new TV at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

* The service does not include connecting satellite equipment or other devices (e.g. games consoles, etc.) to the TV.

More information here

What do you need to do to prepare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The TV will be handled in its packaging, which is approximately 5.5 cm wider than the TV itself.
  • The wall mount is not included with the TV and must be ordered separately (we will contact you the day before delivery to confirm that the wall mount will be available). The TV cannot be wall-mounted without the correct wall mount.
  • A power supply within reach of the TV's power cable.
  • The wall on which the TV will be mounted should be at least 15 cm thick.

How does the installation work?

  • We will unpack the TV and confirm with you the exact location where you would like it mounted on the wall.
  • Use a detector to check whether it is safe to drill into the wall at the chosen location.
  • Select suitable fixings (wall plugs, etc.) based on the wall material.
  • Carefully measure everything, drill the holes and install the wall mount.
  • Explain the wall mount's features and mount the TV.
  • Connect the TV to the mains and then to an aerial or Wi-Fi.
  • Carry out the basic TV setup and show you the basic functions.
  • You must keep the packaging materials for at least 14 days in case you need to return the product.
  • Note: From 1 November to 1 April, the TV will not be connected to the mains due to low temperatures. The TV must first reach room temperature; otherwise, there is a risk of damage to the product.
Montáž vestavné mikrovlnné trouby

Built-in microwave oven installation

We want buying a new built-in microwave oven to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to prepare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • The electrical socket should be no more than 1.3 metres from the appliance.

How does the installation work?

  • We will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • Unpack and inspect your new microwave oven to make sure everything is in order.
  • Connect the new appliance to the mains and place it in the prepared cabinet.
  • Switch on the new appliance to check that it is working properly, then set the clock.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.
Montáž vestavné mikrovlnné trouby

Built-in coffee machine installation

We want buying a new built-in coffee machine to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a professional job and clean up after themselves.

Service price

CZK 1,899 incl. VAT (delivery is not included in the service price)

What do you need to do to prepare before the installation?

  • Ensure there is a clear route through the communal areas and your home to prevent damage to the product or your property. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • The electrical socket should be no more than 1.5 metres from the appliance.

How does the installation work?

  • If necessary, we will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • We will unpack and inspect your new appliance to make sure everything is in order.
  • Connect the coffee machine to the mains.
  • Place the new coffee machine in the prepared space.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up afterwards, say goodbye and take your old appliance and the packaging materials away with us.

Installation cannot be performed if:

  • There is no accessible socket within reach of the appliance’s power cable.
  • The coffee machine does not fit into the kitchen cabinet or prepared housing.
  • The appliance cannot be carried to the intended location because the access route is too narrow. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself, increasing its overall dimensions.
  • The installation requires any building work, drilling or cutting into walls, or modifications to the cabinet housing.
Montáž vestavné ohřívací zásuvky

Built-in warming drawer installation

We want buying a new warming drawer to be as easy as possible for you. That’s why we aim to deliver and install your new appliance at the same time. You can look forward to a friendly and helpful crew who will do a quality job and clean up after themselves.

Service price

CZK 1,899 incl. VAT

What do you need to do to prepare before the installation?

  • A clear route through the communal areas and your home, ensuring that the appliance or the customer’s property is not damaged. The appliance will be handled in its packaging, which is approximately 5.5 cm wider than the appliance itself.
  • The electrical socket should be no more than 1.5 m from the appliance.

How does the installation work?

  • If necessary, we will remove your old appliance and give you the opportunity to clean any hard-to-reach areas.
  • We will unpack and check your new warming drawer to make sure everything is in order.
  • Connect the new appliance to the mains and place it in the prepared cabinet housing.
  • The crew will go through the handover report with you. You will jointly confirm all the work carried out as part of the installation.
  • We will clean up after ourselves, say goodbye, and take your old appliance and packaging materials away with us.
 

Installation of freestanding electrical appliances

What does the service include?

  • The crew will unpack your appliance and take the packaging materials away with them. All you need to do is have the necessary water, power and waste connections ready.
  • This service is available only for freestanding electrical appliances (washing machines, tumble dryers, dishwashers, fridges, freezers, TVs, etc.). It does not apply to electric or gas cookers or other gas appliances.
  • For built-in appliances, the crew will “only” unpack the appliance and take the packaging materials away. If you would like your built-in appliance installed, you need to order the additional Built-in Appliance Installation service together with it.

Before the driver arrives and the installation begins, make sure that:

  • You have the necessary power (electricity, water) and waste connections ready.
  • The connections are compatible with the appliance you have purchased.
  • The appliance you have purchased will fit in the designated space.
  • A tumble dryer may only be stacked on top of a washing machine using the original stacking kit, provided that it does not require drilling. Otherwise, the appliances cannot be stacked.
 

Removal of your old appliance

What does the service include?

  • If you wish, our crew will take your old appliance away when delivering your new one (available with all delivery options), on a 1-for-1 basis (e.g. a new fridge in exchange for your old fridge or another old appliance of a similar or smaller size).

Before the driver arrives and the installation begins, make sure that:

  • Your old appliance is properly disconnected, clean and complete.
  • In the case of washing machines, dishwashers, tumble dryers, fridges and freezers, it is also dry and free of ice.
  • There must be no water left inside the appliance.
 

Delivery insurance

What does the service include?

  • If your order arrives damaged, we will process your claim as a priority. One of our customer service agents will contact you within 24 hours at the latest, and you can resolve everything together.
  • The CZK 39 fee is not included in the AlzaExpres service.
Print
P-DC1-WEB03